Skip directly to site content Skip directly to page options Skip directly to A-Z link Skip directly to A-Z link Skip directly to A-Z link
Volume 10, Number 7—July 2004
Perspective

Environmental and Occupational Health Response to SARS, Taiwan, 2003

Eric J. Esswein*Comments to Author , Max Kiefer†, Ken Wallingford‡, Greg Burr‡, Lukas Jyhun-Hsiarn Lee§, Jung-Der Wang¶, Shun Chih Wang#, and Ih-Jen Su**
Author affiliations: *National Institute for Occupational Safety and Health (NIOSH), Denver, Colorado, USA; †NIOSH, Atlanta Field Office, Atlanta, Georgia, USA; ‡NIOSH, Cincinnati, Ohio, USA; §Department of Health, Taipei, Taiwan; ¶National Taiwan University, Taipei, Taiwan; #Institute of Occupational Safety and Health, Taipei, Taiwan; and; **Taiwan Center for Disease Control, Taipei, Taiwan

Main Article

Table 4

Summary of key features of dedicated SARS hospitalsa,b

Hospital No. IR/no. PRc Work shift Shower outd T&Be % compliancef No. SARS patients
DSH-1
102/un
4 h
Y
Un
100
45
DSH-2 92/210 8 h Y Un 100 21
DSH-3 126/un ND Y Un 40 0
DSH-4 40/60 4 h Y Un 100 0
DSH-5 42/80 3-2-3 h Y Y 95 0
DSH-6 47/108 4 h N Un 60 0
DSH-7 81/100 4 h Y Y 95 0
DSH-8 72/un 3 h Y Un 70 0
DSH-9 78/un 3 h Y Un 90 0
DSH-10 28/49 3-2-3 h Y Un 60 0
DSH-11 32/100 8 h Y Un 100 0

aAll hospitals had a separate healthcare worker and patient path, single-pass air-handling units that provided 100% outside air with no recirculation, HEPA-filtered exhaust systems for the isolation rooms, UV light germicidal irradiation in the exhaust systems, and visible continuous negative pressure monitor with alarm that demonstrated the isolation room is operating under negative pressure.
bSARS, severe acute respiratory syndrome; DSH, dedicated SARS hospitals; un, unknown or unavailable at the time of the investigation; Y, yes; N, no; ND, not done.
cNumber of isolation rooms (IR) constructed and number of patient rooms (PR) previously at the hospital.
dPersonnel exiting the isolation ward are required to shower as part of the change-out protocol.
eFacility has completed a test and balance (T&B) (commissioning) of the ventilation system to verify proper function.
fPercentage of the construction completed.

Main Article

Page created: June 16, 2011
Page updated: June 16, 2011
Page reviewed: June 16, 2011
The conclusions, findings, and opinions expressed by authors contributing to this journal do not necessarily reflect the official position of the U.S. Department of Health and Human Services, the Public Health Service, the Centers for Disease Control and Prevention, or the authors' affiliated institutions. Use of trade names is for identification only and does not imply endorsement by any of the groups named above.
file_external